Eaton ETR-4000-2A2GB0 Transformer Relay - Modbus RTU/RS-485
Part Number: ETR-4000-2A2GB0
Quick Summary
Eaton transformer relay provides transformer protection and monitoring for industrial power systems. This device is designed to simplify protection schemes while delivering clear, actionable diagnostics. Engineers often contend with false trips, complex wiring, and difficult integration with legacy controls; the ETR-4000-2A2GB0 addresses these pain points with a flexible I/O set, modular communication options, and rugged construction. The unit supports Modbus RTU or DNP3 RTU over RS-485, a wide power range (19-300 Vdc, 40-250 Vac), and conformal-coated circuit boards for harsh environments. For transformer protection programs, this model offers reliable protection, easy field maintenance, and scalable monitoring to support OEMs and utility operations alike.
Product Information
Extended Description
ETR-4000-2A2GB0 Eaton: Eaton, transformer relay, ETR-4000, Transformer protection relay, Modbus RTU or DNP3 RTU over D-SUB / RS485, 5A, 1A, 40-250 Vac, 19-300 Vdc, 8, 9,Transformer, D-Sub / RS-485,19-300Vdc, 40-250Vac, 50/60 Hz Sensitive Ground Input,
Product Name
Eaton transformer relay
Catalog Number
ETR-4000-2A2GB0
UPC
786679154045
Product Length/Depth
8.06 in
Product Height
8.7 in
Product Width
9.72 in
Product Weight
9.3 lb
Warranty
Eaton Selling Policy 25-000, one (1) year from the date of installation of the Product or eighteen (18) months from the date of shipment of the Product, whichever occurs first.
Compliances
Contact Manufacturer
Application
Transformer
Type
Transformer relay
Product Category
Transformer protection relay
Analog inputs
0
Analog outputs
0
Base relay
ETR-4000
Conformal coating
Conformal Coated Circuit Boards
Communication
Modbus RTU or DNP3 RTU over D-SUB / RS485
Current sensing inputs
2
Digital inputs
8
Digital outputs
9
I/O options
Sensitive Ground Input Trip Coil Monitor IRIG-B URTD Interface
Modbus / DNP3 RTU
D-Sub / RS-485
Phase current
5A, 1A
Sensing inputs
Differential Protection Current Protection and Metering
Zone selective interlocking
2
Number of inputs
8
Number of outputs
9
Power supply range
19-300Vdc, 40-250Vac
Frequency rating
50/60 Hz
Power consumption
40-250 Vac, 19-300 Vdc
Number of inputs
8
Number of outputs
9
Power supply range
19-300Vdc, 40-250Vac
Power consumption
40-250 Vac, 19-300 Vdc
Frequency rating
50/60 Hz
Terminals
Removable
Mounting method
Semi-flush
Voltage sensing inputs
0
Terminals
Removable
Power metering, monitoring and diagnostics products for OEMs
Power metering, monitoring and diagnostics products for OEMs
Programming an Eaton E-Series Relay, Step 3: Getting Started with the E-Series Wizard
Programming an Eaton E-Series Relay, Step 3: Getting Started with the E-Series Wizard
Programming an Eaton E-Series Relay, Step 3: Getting Started with the E-Series Wizard
Programming an Eaton E-Series Relay, Step 3: Getting Started with the E-Series Wizard
Programming an Eaton E-Series Relay, Step 3: Getting Started with the E-Series Wizard
Programming an Eaton E-Series Relay, Step 3: Getting Started with the E-Series Wizard
Programming an Eaton E-Series Relay, Step 3: Getting Started with the E-Series Wizard
Eaton Specification Sheet - ETR-4000-2A2GB0
Feature → Business Impact → Application: 8 digital inputs and 9 digital outputs streamline wiring and integration, reducing installation time and panel footprint while enabling richer protection logic for transformer assets in substations and industrial plants. The result is faster commissioning and lower lifecycle costs in busy maintenance windows. Feature → Business Impact → Application: Modbus RTU or DNP3 RTU over RS-485 with D-Sub connectivity enables seamless SCADA/EMS integration, improving real-time visibility and predictive maintenance across distributed transformer fleets. This supports tighter fault localization and reduced unplanned downtime in critical energy infrastructure. Feature → Business Impact → Application: Dual power-supply range (19-300 Vdc, 40-250 Vac) and 50/60 Hz operation provide flexible deployment in variable electrical environments, lowering the need for dedicated power conditioning and simplifying spare-parts planning for OEMs. Feature → Business Impact → Application: I/O options including Sensitive Ground Input, Trip Coil Monitor, IRIG-B URTD interface enhance protection accuracy and time synchronization, delivering precise protection coordination in complex protection schemes for utilities and industrial users. Feature → Business Impact → Application: Conformal-coated circuit boards and removable terminals improve reliability in harsh environments and ease maintenance, supporting longer asset life and faster field service in harsh industrial settings. Feature → Business Impact → Application: Zone selective interlocking and robust metering capabilities support advanced protection strategies, enabling selective tripping and improved coordination in transformer banks for substations and large OEM installations.
Get a Quick Quote for a Eaton ETR-4000-2A2GB0
Chat with us on WhatsApp - fast responses guaranteed
Need to speak with someone? We'll call you back within 2 hours during business hours
Interested in Eaton ETR-4000-2A2GB0?
Enquire Now
FAQs
Yes. The device supports a dual power range of 19-300Vdc and 40-250Vac, making it suitable for installations with variable supply conditions and reducing the need for separate power conditioning equipment.
It supports Modbus RTU or DNP3 RTU over RS-485 via a D-Sub interface, enabling straightforward integration with common SCADA/EMS platforms and enabling remote monitoring and diagnostics.
Yes. Designed as a transformer protection relay with differential protection and metering capabilities, it fits both substation applications and OEM equipment requiring robust transformer protection and monitoring.
Compliance details are not listed in the provided data. Verify CE/SIL/IP specifics with Eaton through the official datasheet (ETR-4000-2A2GB0) or Eaton support to ensure regulatory requirements are met for your installation.
The model follows Eaton’s policy with a warranty of one year from installation or eighteen months from shipment, whichever occurs first, providing a foundation for maintenance planning and long-term asset protection.