Eaton PXMP-SCE8-3 Power Xpert Meter Cable - UL 61010-1

Part Number: PXMP-SCE8-3
Manufacturer
Eaton
Part number
PXMP-SCE8-3

Quick Summary

The Eaton PXMP-SCE8-3 Power Xpert multi point meter cable enables scalable sensor extension for multi-point energy metering in industrial controls. Engineers often struggle with wiring complexity and ensuring measurement accuracy across multiple meters. This UL listed kit meets safety standards to UL 61010-1 and UL E185559, delivering reliable protection for control panels and metering hardware. Designed for Power Xpert multi-point metering installations, it streamlines wiring, reduces downtime, and supports scalable energy monitoring programs across your facility.

Product Information

Extended Description

PXMP-SCE8-3 Eaton: PXMP Sensor Extension Cable Kit, (3) 8 ft, used with PXMP-CSXXX and PXMP-IMXXX
Product Name
Eaton Power Xpert multi point meter cable
Catalog Number
PXMP-SCE8-3
UPC
786685623962
Product Length/Depth
96 in
Product Height
0.28 in
Product Width
0.28 in
Product Weight
0.8 lb
Warranty
1 year
Certifications
UL Listed file E185559 UL Listed file 61010-1
Used with
PXMP-CSXXX and PXMP-IMXXX
Special features
Used with PXMP-CSXXX and PXMP-IMXXX
Type
PXMP Sensor Extension Cable Kit
Cable size
(3) 8 ft
The PXMP-SCE8-3 includes three eight-foot sensor extension cables that provide flexible routing within control panels, reducing panel crowding and enabling faster installation. Business impact: quicker deployment translates to reduced labor costs and shorter project timelines, while preserving measurement integrity for critical loads. Application: ideal for PXMP-CSXXX and PXMP-IMXXX configurations, enabling plug-and-play interoperability with existing meters and modules. This compatibility lowers configuration risk and accelerates commissioning in new or retrofit projects. The kit’s slim profile—96 in total length with compact 0.28 in width and height—optimizes space in crowded panels, enhancing serviceability and future expansion. Benefit: safer wiring practices and easier maintenance, contributing to overall total cost of ownership improvements. Certifications and safety compliance are reinforced by UL Listed status to 61010-1 and UL E185559, supporting audits and regulatory adherence. The lightweight design (0.8 lb) simplifies handling during field installation, while the included 1 year warranty provides procurement confidence and risk mitigation for ongoing operations. Long-term value comes from reduced wiring errors, consistent data quality from multi-point sensing, and a scalable path to energy submetering across expanding facilities.

Get a Quick Quote for a Eaton PXMP-SCE8-3

Chat with us on WhatsApp - fast responses guaranteed

Need to speak with someone? We'll call you back within 2 hours during business hours

Interested in Eaton PXMP-SCE8-3? Enquire Now

FAQs

PXMP-SCE8-3 is designed for use with Eaton PXMP-CSXXX and PXMP-IMXXX modules. It includes three eight-foot sensor extension cables that connect directly to the Power Xpert metering system, enabling plug-and-play integration. For installation, route each cable to its designated PXMP sensor point, secure cables to avoid strain, and verify each connection before powering the unit. This minimizes setup time and wiring errors.
Key specs include three cables at eight feet each, total length 96 inches, a compact 0.28 inch width and height, and a weight of 0.8 lb. The product is UL Listed to safety standard 61010-1 with UL file E185559, catalog PXMP-SCE8-3, and UPC 786685623962, ensuring compliance for industrial control panel installations.
Yes, its slim profile (0.28 in Ă— 0.28 in) and flexible 96 in length support dense panel layouts by reducing wiring congestion. UL 61010-1 compliance provides safety assurances for industrial controls. For environments with harsh conditions, verify site-specific exposure and enclosure ratings, and consider additional cable management for long-term reliability.
The three eight-foot cables simplify routing and reduce field wiring complexity, delivering faster commissioning and fewer reworks. Expect lower labor costs during installation and quicker time-to-value from accurate multi-point measurements. The 1-year warranty further mitigates procurement risk, contributing to a favorable return on investment over the system’s lifecycle.
Resources are available through Eaton, including the Specification Sheet for PXMP-SCE8-3, the white paper on wireless multi-point energy submetering, and the YouTube configuration/tooling tutorials for Step 4 Monitoring in the Configuration Tool. These materials support design decisions, installation planning, and ongoing system optimization.